This course is the second part of the two-semester-long senior year graduation project. Completion of the validation step to show the credibility of the proposed solution strategy. Measure the benefits realized from the proposed approach when compared to the current system by benchmarking. Prepare a detailed implementation plan with the company on how to integrate the proposed strategy within their current operations and execute the plan. Throughout the semester, teams plan their activities by determining and updating work packages and time schedules. Teams demonstrate their communication capabilities with reports and presentations.
İlk dosyayı sen ekleyebilirsin — notlar, geçmiş finaller, çözümler, cheat-sheet, ne varsa. Drive linki / PDF / ZIP / fotoğraf, hepsi olur.
Şu an: mail at, ben düzenleyip yayına alayım. Form/upload UX yakında geliyor (Kimya tasarlıyor).
| Dönem | Course CPA | |
|---|---|---|
| 2024-2025 Spring | 3.60 | 3 sec · 160 öğr |
| 2023-2024 Spring | 3.44 | 3 sec · 146 öğr |
| 2022-2023 Spring | 3.47 | 3 sec · 147 öğr |
| 2021-2022 Spring | 3.52 | 3 sec · 155 öğr |
| 2020-2021 Spring | 3.61 | 3 sec · 146 öğr |
| 2019-2020 Spring | 3.60 | 3 sec · 143 öğr |
| 2018-2019 Spring | 3.55 | 3 sec · 158 öğr |
| 2017-2018 Spring | 3.41 | 3 sec · 178 öğr |
| 2016-2017 Spring | 3.54 | 3 sec · 123 öğr |
| 2015-2016 Summer | 2.62 | 1 sec · 17 öğr |
Aggregate course GPA — Bilkent STARS'tan public data. Hoca-bazlı per-section detayı için STARS evaluation report →. Öğrenci anket cevapları KVKK kapsamında defter'de tutulmaz.