Architectural Acoustics teaches you to treat sound as a design material — something to shape, absorb, and contain rather than tolerate — alongside the building-code side of fire safety that interior designers are expected to know but rarely get taught. Most of the semester runs through Egan's framework for room acoustics and sound isolation, but the real work is a term project where you analyze and propose acoustical treatments for a real space, supported by studio exercises and a midterm on the underlying theory. Coming in your third-year autumn, it's the moment where studio decisions start being judged on performance criteria, not just spatial composition, and the noise-control intuition you build here carries into thesis-level interior projects.
→ STARS müfredatı (resmi syllabus)
İlk dosyayı sen atarsan — not, slayt, geçmiş sınav, çözüm, cheat-sheet, ne varsa — defter ekibi öğrenci paylaşımlarından bu dersin notlarını yazar. Drive linki / PDF / ZIP, hepsi olur.
| Dönem | Course CPA | |
|---|---|---|
| 2025-2026 Fall | 2.78 | 5 sec · 165 öğr |
| 2024-2025 Fall | 2.75 | 4 sec · 162 öğr |
| 2024-2025 Summer | 2.98 | 1 sec · 8 öğr |
| 2022-2023 Fall | 2.04 | 2 sec · 78 öğr |
| 2022-2023 Summer | 2.52 | 1 sec · 14 öğr |
| 2020-2021 Fall | 2.87 | 4 sec · 80 öğr |
| 2020-2021 Summer | 1.95 | 1 sec · 12 öğr |
| 2019-2020 Fall | 2.82 | 4 sec · 76 öğr |
| 2019-2020 Summer | 3.02 | 1 sec · 14 öğr |
| 2018-2019 Fall | 2.73 | 3 sec · 93 öğr |
Aggregate course GPA — Bilkent STARS'tan public data. Hoca-bazlı per-section detayı için STARS evaluation report →. Öğrenci anket cevapları KVKK kapsamında defter'de tutulmaz.
Course Learning Outcomes: Course Learning Outcome Assessment Technical problem solving skills and achieving optimum/cost effective problem solutions to acoustical and fire safety problems. Room Acoustics Part 1: Pre-submission Application of the codes/standards and principles on the acoustical and fire safety problems. Architectural Acoustics Information on the principles and applications of acoustics, noise control and fire prevention in the buildings. Part 2: Final submission